ഒരു ഗ്രാമം സ്വപ്നങ്ങളിലേക്ക്, പറന്നുയരുന്നു
CSR Partnership · FY 2026–27

The structure stands. Help us open the doors.

Grace Montessori School and Community Centre in South Malipuram, Kochi, is half built: six classrooms, a palliative-care room and a counselling centre for 300–400 working families. The foundation and frame are paid for. CSR support finishes the rooms.

₹77LCSR support sought to finish and open the building
₹36LAlready raised and spent by SMART. The frame is up.
8 rooms6 classrooms, a palliative-care room and a counselling centre
1,500+residents in the catchment, served since 2013
●Registered society · EKM/TC/846/2014 ●80G · ABMAS8669PF20231 ●Schedule VII items (i), (ii), (iii) ●CA-audited, last 3 years ●Zero overheads in the budget
Why this is a sound CSR investment

Completion, not a start.

The hardest and least visible work, a piled foundation on marshland, is finished. From here every rupee buys something you can see: a slab, a wall, a floor, a desk.

A school that already runs

Grace Montessori already teaches from a small facility. This building gives it more space. It is not a new programme that still has to prove itself.

Clear unit costs

₹5 lakh completes and furnishes one room, and each room has its own estimate and completion certificate.

Local-area fit for Kochi companies

Section 135 asks companies to prefer their local area. The site is across the Goshree bridges from the High Court of Kerala.

The ground-floor frame of the SMART building with formwork up for the first-floor slab, and the SMART Project signboard
November 2026: formwork for the first-floor slab
Grace Montessori pupils in uniform on back-to-school day
Grace Montessori pupils
A lane in South Malipuram with a cyclist and power lines
South Malipuram
The need

Minutes from the High Court,
a quarter-century behind.

South Malipuram lies on Vypin Island. Most families came here from the street settlements of Fort Kochi and Mattancherry. They built land out of dredging silt and live on daily wages from the fishing harbour and the LNG terminal.

1,500+residents
300–400families
295houses
105houses severely deteriorated

A school outgrowing its room

Grace Montessori teaches from a small facility. The new building lets it run Pre-KG to Class 4 under one roof.

Early years decide who stays

Children here tend to drop out in upper-primary school. A strong start between the ages of 3 and 10 is how that is prevented.

Care needs an address

The panchayat's 24 wards share one primary health centre. The ambulance and home-care team, and families looking for counselling, need a room close to home.

The project

One building, three services.

Ground plus two floors, 3,086 sq ft per floor. A permanent home for Grace Montessori School, with palliative care and counselling under the same roof: a community centre for all of South Malipuram.

LEARN01

Grace Montessori School

Pre-KG, KG and Classes 1 to 4 in six classrooms, following the NIOS syllabus. Once the building is finished, SMART can apply to be an accredited NIOS centre.

CARE02

Palliative care & physiotherapy

A clinic room and a base for the ambulance and home-care team that already visits bedridden patients.

COUNSEL03

Aswas Counselling Centre

Private sessions for parents, adolescents and families, alongside SMART's "Eve Talk" parent-awareness series.

Floor plan · 286.82 m² per floor
In this requestFunded separately
Second floor
Auditorium · roofing
Stairs
Dressing room
First floor
Aswas Counselling
Class 1
Class 2
Class 3
Class 4
Staff room
Ladies' prayer hall
Ground floor
Pre-KG
KG
Palliative care & physio
SMART office · conference
Principal
Toilets: girls, boys, accessible

A schematic based on the architect's drawings, not to scale.

Progress so far

The hard part is already built.

SMART and its supporters have raised and spent about ₹36 lakh on this building, ₹15–20 lakh of it on the piled foundation alone. What remains is the work that turns a concrete frame into rooms.

Piled foundation & plinthComplete
Ground-floor columns, beams & slabComplete
First-floor columns & formworkComplete
Walls, floors, doors & windowsFunding sought
Toilets, roofing & groundsFunding sought
₹36 lakh invested by SMART₹77 lakh to finish · total ≈ ₹1.13 crore
Front of the half-built SMART building showing columns and the staircase
Staircase and first-floor deck
Supporters gathered at the foundation stone of the SMART Educational Complex
Foundation stone, November 2024
Budget

What it takes to finish: ₹77 lakh.

The completion is split into eight budget lines, each costed on its own. A partner can fund the whole building, one block or a single room.

₹10LPriority 1 · Structure
₹45LPriority 2 · Rooms & toilets
₹22LPriority 3 · Roofing & grounds
#Component and basisUnits × rateAmount (₹)Priority
1First-floor slab concreting (3,080 sq ft)Balance of the ₹20,00,000 estimate; SMART meets the other ₹10 lakhLump sum10,00,0001
2Six classrooms: Pre-KG, KG, Classes 1–4Per room: completion ₹3,00,000 + furniture & learning materials ₹2,00,0006 × 5,00,00030,00,0002
3Palliative-care and physiotherapy roomCompletion ₹3,00,000 + furniture & equipment ₹2,00,0001 × 5,00,0005,00,0002
4Aswas Counselling CentreCompletion ₹3,00,000 + furniture & equipment ₹2,00,0001 × 5,00,0005,00,0002
5Toilet blockGirls', boys' and accessible toiletsLump sum5,00,0002
6Auditorium roofingSecond-floor community hallLump sum6,00,0003
7Playground roofingA covered play area that can be used through the monsoonLump sum10,00,0003
8Ground tiling and landscapingPaved yard and planting around the buildingLump sum6,00,0003
Total CSR support sought (Rupees seventy-seven lakh only)77,00,000
No overheads

The budget has no administrative or management charge. Every line is construction or fit-out.

Itemised estimates

Itemised estimates for the slab and for one room are available. Quotations for the lump-sum items will be shared before the agreement is signed.

SMART's own share

The ≈ ₹36 lakh already invested in piling and structure is not part of this request.

Funding models

Five ways to fund the building.

Choose the model that fits your CSR budget and reporting cycle. All five use the same agreement, the same milestone-linked releases and the same reporting.

A

Principal partner

₹77,00,000

Funds the whole completion under one agreement, with one consolidated report and full attribution.

Suits a company that wants one flagship project.
B

Block partner

₹5L – ₹30L

Funds one complete block: structure ₹10L, six classrooms ₹30L, care wing ₹10L, toilets ₹5L, auditorium roof ₹6L, or the play area and grounds ₹16L.

Suits a fixed budget that still has to deliver a finished outcome.
C

Room sponsor

₹5,00,000 / room

Completes and furnishes one named room: a classroom, the palliative-care room or the counselling centre.

Suits first-time partners and smaller CSR budgets.
D

Co-funding consortium

Any amount · ₹35,000 shares

Several companies fund one block together, and each receives its own utilisation certificate. Building-fund shares are open to smaller firms and to employee giving.

Suits industry associations, MSMEs and employee groups.
E

Two-year partnership

₹55L + ₹22L

Phase A (FY 2026–27) opens the school and care rooms: the slab, eight rooms and the toilets. Phase B (FY 2027–28) adds the auditorium roof, the covered play area and the grounds.

Suits a commitment spread across two CSR budgets.
In-kind support is welcome under every model. Cement, steel, tiles, furniture or computers delivered to the site are valued, receipted and reported in the same way as cash.

Schedule VII, Companies Act 2013

  • (ii)Promoting education: Grace Montessori School, Pre-KG to Class 4
  • (i)Health care: palliative care and physiotherapy for bedridden patients
  • (iii)Senior citizens and socially and economically backward groups

UN Sustainable Development Goals

  • SDG 4Quality Education
  • SDG 3Good Health and Well-being
  • SDG 10Reduced Inequalities
Implementation

Eight months to handover.

Work resumes when the first release arrives. If support is committed by January 2027, the classrooms can open with the school year in June 2027.

RELEASE 140%

On signing. Mobilisation and the first-floor slab.

RELEASE 230%

Walls and plaster complete, certified by the site engineer.

RELEASE 320%

Floors, doors, windows and painting complete.

RELEASE 410%

After handover, the completion report and the audited utilisation certificate.

This is a proposed schedule. Where a partner's own release terms differ, SMART will follow them.

M1 is the month of the first release. With a January 2027 start, M8 is August 2027. The programme is indicative and will be confirmed with the contractor at signing.

Outcomes and reporting

What changes, and how you will know.

Measured at handover (month 8)Today · Nov 2026Target
Classrooms completed and furnished0 of 66 of 6
Care rooms completed and furnished0 of 22 of 2
Girls', boys' and accessible toiletsNot builtIn use
Auditorium and play areaNot roofedRoofed and in use
NIOS accreditationNot yet eligible to applyApplication filed
EVERY MONTHProgress note

Dated site photographs, the work done and the money spent.

EACH MILESTONEStage certificate

Signed by the site engineer before the next release.

AT HANDOVERCompletion file

Completion report, asset list and audited utilisation certificate.

AFTER ONE YEAROutcome report

First-year results against the measures above.

Open to inspection. The partner's team, or an agency it appoints, may visit the site and examine the project accounts at any stage. SMART will support an independent impact assessment if the partner commissions one.

How partners are acknowledgedPrincipalBlockRoomShare

Acknowledgement is a courtesy to partners, not a marketing sponsorship. The CSR Rules exclude activities supported to gain a marketing benefit, so naming will follow each partner's CSR policy.

Track record

Thirteen years in one neighbourhood.

SMART began in 2013 as a ten-year programme for a single settlement. It has stayed on, and its work has widened from schooling and housing to women's livelihoods and palliative care.

2013

SMART begins

A ten-year plan for one settlement: education, women's empowerment and housing. Registered as a charitable society in 2014.

2016

Study hall, computer centre and library open

Inaugurated by Shri S. Sharma, MLA, and Dr K. M. Abubacker of CIGI. Computer classes for women are taught by two faculty members from the community.

By 2023

Phase 1 delivered

Grace Montessori pre-primary school started. Ten dilapidated houses rebuilt. A children's arts and sports club, a playground and awareness classes running.

2024

Foundation stone laid

Laid in November for the SMART Educational Complex.

2025

"Eve Talk" sessions for parents

Sessions on mobile addiction, healthy relationships, and family, law and ethics.

2026

Structure up

Ground floor complete; first-floor slab under way.

Organisations that have worked with SMART

People's FoundationProgramme partner
EDMAQ QatarMontessori school facilitator
Baithu Zakath KeralaTen houses rebuilt
Amity Charitable Trust, KochiStudy hall, computers, survey
Ignitarium Technology SolutionsLaptops for women's skills training
ECGF EdavanakkadPhase 1 promoter
Women trainees receiving laptops sponsored by Ignitarium

Women & skills

Laptops sponsored by Ignitarium for skills training, taught by faculty from the community.

The SMART palliative-care ambulance with team members

Palliative care

An ambulance and home-care visits to bedridden patients, running today.

A newly built house in South Malipuram

Housing

Dilapidated homes rebuilt with partners including Baithu Zakath Kerala.

Students receiving awards at a SMART education event

Scholarships

Scholarships and school kits every year for children who need support to keep studying.

Governance

Registered, audited and accountable.

SMART is a registered charitable society that has worked in one settlement since 2013. A Chartered Accountant has audited its accounts for each of the last three years.

Who is responsible

Bank transfer only

Grants are received by bank transfer, into a separate project account if the partner asks.

A ledger of its own

Every receipt and payment is booked to a project ledger, by budget line.

Payment against bills

Suppliers are paid by cheque or transfer against bills. Quotations stay on file.

Annual audit

Audited every year by a Chartered Accountant. The last three years are available.

Utilisation certificate

Certified by the auditor after handover, itemised by budget line.

Unspent balance

Refunded, or reallocated only with the partner's written consent.

The school and care services are open to every family, whatever their religion, caste or gender. Grant funds pay only for the eight budget lines above; the ladies' prayer hall, offices and staff room are funded separately. No government body, public-sector undertaking or company has ever blacklisted SMART.

Next steps

Start with a visit to the site.

South Malipuram is a short drive from the High Court of Kerala. An hour on site shows you the structure, the school at work and the families it serves.

Site visit

SMART hosts your CSR team at South Malipuram and presents the proposal to your committee.

Due diligence

We hand over the documents below and answer questions from your finance and legal teams.

Agreement

You choose a funding model, and both sides sign an MoU covering the budget, milestones, reporting and acknowledgement.

First release

Work resumes in the month the first release arrives, starting with the first-floor slab.

Handover

The rooms are inspected jointly and inaugurated by the partner. The completion report and audited certificate follow.

Contact

Bank account for the grant

Account name
South Malippuram Rehabilitation Society (SMART)
Account no.
0609053000007821
Bank
South Indian Bank, Murukumpadom
IFSC
SIBL0000609
80G
ABMAS8669PF20231

Please email smartprojectpd@gmail.com after you transfer, so we can send your receipt and 80G certificate.

Documents for your due diligence

  • Registration certificate and bye-laws
  • 12A and 80G orders, and PAN card
  • CSR-1 registration certificate
  • Audited accounts and tax returns for the last three years
  • Activity reports for the last three years
  • Governing-body list with addresses
  • Land title deed and latest encumbrance certificate
  • Building permit and approved drawings
  • Estimates signed by a licensed engineer
  • Cancelled cheque of the Society's account